B.K. Engineering Co.,Ltd.

Remodeling

HOME > Business Scope > Remodeling

Remodeling

  • ItemConstruction Projects
  • FOB PriceTo be negotiated by tank size
  • M.O.QTo be determined
  • Supply AbilityAs requiredv
  • Payment Terms1st 70% after contract sign, 2nd 30% after completion

Product Description

  • There are requirements for water tank movement, size changes and capacity changes. In this case, most of companies recommend removal of existing water tank and installation of new water tank.
  • We have different approach, which is reuse of panels and steel frames after comprehensive inspection of the parts and minimize the new parts requirements. We can provide client with water tank by minimum cost.
  • Existing TankExisting Tank
  • Removal of Existing TankRemoval of Existing Tank
  • Carrying New TankCarrying New Tank
  • CompletingCompleting